Jefferson Health Honickman Center

Philadelphia, PA
Scroll >

This project featured the construction of a 19-story, 462,000 SF Specialty Care Pavilion and a 158,750 SF 3-level, 275-space underground garage for Jefferson Health, the largest capital project in their history. Early work included the demolition of an Art Deco-styled prewar parking garage at 1101 Chestnut Street.

The completed Honickman Center combines all of Thomas Jefferson University Hospital’s and Jefferson Health’s outpatient services into a single building. This includes the Jefferson Transplant Institute, Korman Respiratory Institute and Digestive Health Institute, and various clinical specialties such as cardiovascular, otolaryngology, rheumatology, and urology. The state-of-the-art facility features over 300 exam rooms, 58 infusion chairs, 10 operating rooms and PACU, 6 endoscopy rooms, imaging and lab services, physicians’ offices, conference space and administrative offices, and a pharmacy.

The building is equipped with dedicated mechanical floors, a mechanical well housing cooling towers and emergency generators. Ground and second levels feature a two-story atrium entry lobby, with security desk, provisions for electronic check-in kiosks, and dedicated elevators for the underground garage, with loading dock and storage areas. A porte-cochere extends to the second floor Cafe, waiting areas, lounge and pharmacy, with a planted green roof surrounding the level’s exterior. Digital wayfinding, virtual surgical theaters, voice assistants, wearable data integration, augmented and virtual reality, and robotics are featured in the buildings’ design.

Market Sector
Services
Pre-Construction
Construction
Post-Construction/Close-out
Client
National Real Estate Development
Thomas Jefferson University
Owner's Representative
CBRE
Architect
Ennead Architects
Stantec
Bower Lewis Thrower Architects
Size
620,750 SF
Completion Date
2023
LEED
LEED Gold
Photo / Rendering Credit
Renderings Courtesy of Ennead Architects