Temple University Tyler School of Art

Higher Education

Client

  • Temple University

Architect

  • H2L2 Architects / Planners  LLP

Location

  • Philadelphia, PA

Hunter Roberts Construction Group provided Construction Management services to Temple University for the construction of a new state-of-the-art facility for the instruction of fine arts.  The new building is a three-story, 255,000 SF, steel structure on spread footings with strip windows and masonry walls and features new Terrazzo flooring in the main lobby.

The building featured energy-efficient construction techniques employed for the walls, roof and windows, and provides instructional and creative studios and labs, ground floor galleries, workshops, 8,000 SF of exhibition space, and administrative and faculty offices. The facility boasts the most advanced visual arts facilities in the region and functions as a world-class exhibition space and educational tool. The building also includes spaces for innovative large-scale and installation pieces, a central media output center, shared computer labs, computer-integrated classroom spaces and comfortable and accessible cafes and lounges. In addition, the courtyard provides the largest green space on Temple University’s Main Campus.

The building itself is distributed over 4 floors, with the “heavy” studios – those that require fork lift access and more industrial applications such as Ceramics, Glass, and Sculpture – located on the first floor, and the “lighter” studios – those such as Fibers and Printmaking – on the second floor.  The Painting and Drawing studios are located on a partial third floor, in a loft-like space facing north. Photography, Woodshop, General Storage, and the main Mechanical and Electrical Rooms are located on the lower level. The scope of work included laboratory metal casework and new & relocated existing FF&E, amounting to over $6 million. The MEP coordination process and requirements for this amount of equipment was very extensive.

The scope also involved tying into the existing loop of a 6,000 Ton chiller and installing a 1,500 Ton chiller to supplement the additional cooling requirements.