Kennedy Health System

Healthcare

Client

  • Kennedy Health System

Architect

  • Perkins Eastman / Cubellis / Robert D. Lynn Associates / VITETTA / Schade Engineering

Location

  • Various Sites

Hunter Roberts provided pre-construction and construction management services to Kennedy Health System for multiple projects at their Washington Township, Stratford and Cherry Hill campuses.  The scope of work included:

Washington Township:

  • 3rd Floor ICU / Med Surg Suite Fit-out (18,000 SF)
  • 2nd Floor Surgical Suite / PACU / CPD Fit-Out/Renovation (32,000 SF)
  • MOB Addition for New Linear Accelerator and Support Space; Alterations to Radiation Oncology – Pre-Construction Services (6,300 SF)
  • MRI Fit-Out (770 SF)
  • Laboratory Expansion (3,166 SF)
  • Main Lobby Renovation to an Existing Public Corridor and Waiting Areas (3,800 SF)
  • Cardiac Catheterization Lab

Stratford Township:

  • New Emergency Dept. Addition and Renovation – Pre-construction Services (8,200 SF)
  • Exterior Skin Replacement and Infrastructure Upgrades
  • Dr. Brown’s Parking Lot
  • Employee Pharmacy
  • ED Results Waiting Room & Treatment Area Facelift

Cherry Hill:

  • New Emergency Department Addition & Renovation (11,010 SF)
  • Same Day Surgery Addition – Pre-construction Services (6,670 SF)
  • CT Scan (975 SF)
  • X-Ray Room (225 SF)
  • Psychiatric Unit
  • Robotics Lab Fit-out (6,200 SF)
  • Sleep Lab (1,800 SF)